DIU Research and Publication Archive

    • Login
    View Item 
    •   DIU Research and Publication Archive Home
    • Textile Engineering
    • Project Report of B.Sc
    • View Item
    •   DIU Research and Publication Archive Home
    • Textile Engineering
    • Project Report of B.Sc
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Study on industrial engineering

    Thumbnail
    View/Open
    152-23-4346.pdf (3.437Mb)
    Date
    2018-04-10
    Author
    Hossian, Md. Mahafuz
    Mamun, Md. Al-
    Metadata
    Show full item record
    Abstract
    This project is on “Study on Industrial Engineering in Euro-Tex Knitwear Limited”. This paper introduces the various concepts and methods that have been used in Industrial Engineering as a part of apparel engineering in Garment industries. Generally, Industrial Engineering department do Calculate SAM, SMV, Line balancing, Work study, Time study, Working for how to increase the productivity, Sewing floor layout, Line layout etc. First of all we would like to try express chapter 3 properly because of this is analytical part of this thesis project. First data of this chapter is Euro-Tex sewing m/c data analysis where we get, Euro-Tex sewing floor divided into two floor 2nd floor and 5th floor. Total sewing m/c of two floor is 821 and none of m/c are defected. Next we discussed about Leggings operation bulletin sheet, where from we get total SMV of a Leggings is 5.51 minutes, operator used 19 and helper needed 5, Operator and helper ratio is 1: 0.27. After that we try to analyzed about Tee-Shirt L/S making total SMV time is 6.01 minutes 19 operator and 7 helper need for this job done and the ratio is 1: 0.37. After that we try to discuss about company efficiency and productivity per month. This is the middle range of company where else their monthly production target is 427600 pcs and production is 399795 pcs. Average target fill-up 93.5% and average efficiency is 65.9%, NTP time is 0. Finally we try to express all the analytical data from sheet graphically in chapter 4. The aim of this project is to know the sequence of industrial engineering as more as practically. By going through this project work one can easily understand what generally happens underneath the execution of procedure of the Engineering.
    URI
    http://hdl.handle.net/20.500.11948/2923
    Collections
    • Project Report of B.Sc [178]

    copyright © 2002-2016  Daffodil International University. All rights reserved.
    Contact Us | Send Feedback
    Developed by 
    DIU Library IT Solution
     

     

    Browse

    All of DSpaceCommunities & CollectionsThis Collection

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    copyright © 2002-2016  Daffodil International University. All rights reserved.
    Contact Us | Send Feedback
    Developed by 
    DIU Library IT Solution